BL Harbert’s scope of work for this 314,845-square-foot manufacturing facility for GE includes the site development and infrastructure, the construction of the building’s shell and interior build-out, and installation of MEP systems and process piping. The high-tech facility also includes a switchgear, back-up power generation system, chillers, cooling towers, and other related processes necessary for facility’s operation.
We are proud to have delivered this project on time and on budget with the highest quality facility, value engineered to best meet the client’s needs for many years to come.
This award winning design-build project is a significant achievement for the Auburn community, the Alabama economy, and the Architecture/Engineering/Contracting industry. A LEED Silver certified building, the GE Aviation Manufacturing Facility is proof that we can successfully combine sound environmental stewardship with industrial construction.