The project includes the construction of a railcar unloading pit complete with railcar shakers to unload aggregate from unit trains.
Also includes in the installation of two transfer hoppers, five fixed conveyors and one radial stacker conveyor. The system was designed to unload -3” rock at 3,000 TPH, and consists of 668 linear feet of fixed conveyors, one 175-linear-foot radial stacker, a set of truck scales, and 6,000-cubic-yards of concrete paving.